Pale-sided two-story home with dark-framed windows, a stone foundation, deep lawn and mature oak in clear afternoon light.

Ashburn VA Property Taxes: How Data Centers Shape Your Bill

Two Ashburn homes with the same assessed value can get two different property tax bills. Loudoun County's general real property rate for 2026 is $0.805 per $100 of assessed value. A parcel inside the county's Metrorail Service Tax District also pays a $0.20 special levy, so its combined rate is $1.005. On Loudoun's average 2026 assessment of $798,400, that difference is roughly $1,600 a year, and it doesn't show up when you compare ZIP codes.

When you compare Loudoun with Fairfax, the $0.805 headline rate is the number everyone quotes. Data center revenue holds that number up. The county's own budget says that revenue will level off. And as of this week, the Board of Supervisors is deciding whether to slow it down. A buyer looking at Ashburn in October 2026 is really choosing a tax structure, and not every parcel shares the same one.

The Line Near the Silver Line

Loudoun set up its rail service districts on December 5, 2012 to help pay for the Phase II Metrorail extension to Dulles Airport and Ashburn. In the county's words, "All parcels in the districts, residential and commercial, have a special property tax rate for funding of the rail." The boundaries mostly follow major roads and streams within two miles of the stations, with some parcel lines mixed in. When the districts were drawn, they covered mainly commercial land and only a few homes.

The part that matters for buyers is that the boundary follows physical features. Two homes a short walk apart can land on opposite sides of it. Several district names show up in the county's 2026 rate table, and they're easy to mix up:

  • Metrorail Service Tax District: $0.200 per $100 on top of the general rate
  • Ashburn Station service district: $0.000
  • Loudoun Gateway-Airport Station service district: $0.000
  • Route 28 Highway Transportation Improvement District: $0.105, limited to commercial and industrial property, so it doesn't apply to homes

A $0.000 station rate can make a listing near Ashburn Station look like it carries no rail tax. The $0.20 Metrorail levy is a separate district. The county offers a Metrorail Service District Parcel Lookup that checks a specific parcel, and it gives a more reliable answer than a street name or a sense of how close the station is.

What $0.805 Buys Against Fairfax, Parcel by Parcel

Fairfax County's 2026 base real estate rate is $1.12 per $100, and some parcels pay district rates on top of that. Here is the same $798,400 assessment, which is Loudoun's average home value for 2026 according to the adopted budget, run through each rate.

Parcel type, 2026 rates Combined rate per $100 Annual bill on $798,400
Ashburn, outside special rail districts $0.805 about $6,427
Ashburn, inside Metrorail Service Tax District $1.005 about $8,024
Fairfax County, base rate only $1.12 about $8,942

The Loudoun gap against Fairfax is about $2,500 a year on that assessment. For a parcel inside the Metrorail district, it shrinks to roughly $900. That changes the math for a buyer who is weighing an Ashburn townhome near the station against a Fairfax option on monthly carrying cost. Real estate tax is only one line in that comparison. Loudoun lowered its 2026 vehicle tax rate to $3.09 and plans $2.94 for 2027, which pulls a household's total county bill in the other direction.

Who Is Actually Paying for the Low Rate

Loudoun's rate has fallen nearly every year for a decade, from $1.145 per $100 in 2016 to $0.805 today. The county calls that the lowest rate in Northern Virginia. The money that made those cuts possible doesn't come from houses.

The FY 2027 adopted budget estimates $879.1 million from the personal property tax on data center computer equipment and $417.7 million from data center real property. That's about $1.297 billion combined. Measured against the budget's $2.907 billion in local tax revenue, data centers cover about 44.6 percent. WUSA9's reading of the same budget puts it at about 46 percent of local tax funding for county government and Loudoun County Public Schools. The two figures use slightly different denominators. Either way, nearly half of the local tax base rests on one industry.

The rate on that equipment hasn't moved. The general personal property rate that data centers pay is $4.15 per $100 for 2026 and again for 2027. All of the revenue growth comes from more equipment going into more buildings. The cushion an Ashburn homeowner enjoys depends on construction continuing, more than on any rate staying where it is.

A Flat Rate That Still Raised the Average Bill

Loudoun kept the rate at $0.805 for 2026, the same as 2025. The budget also reports a figure that rarely makes it into listing comparisons. Apart from new construction, taxable property that existed at the start of 2025 rose about 9.39 percent in market value during calendar 2025. The equalized rate, meaning the rate that would have brought in the same revenue as the year before, was $0.735.

Holding at $0.805 rather than dropping to $0.735 brought in more money from existing property. For the average home, the effect was modest. The assessment went from $780,100 in 2025 to $798,400 in 2026, about 2.35 percent, and the bill went from $6,280 to $6,427, an increase of $147.

Compare the 9.39 percent countywide revaluation with the roughly 2.35 percent rise for the average home. The arithmetic suggests most of the countywide jump happened outside the typical house. The budget's residential detail for the prior year points the same way. Total taxable residential assessments rose 2.46 percent in tax year 2025, with 1.36 points from revaluing existing homes and 1.10 points from new development. Homeowners are paying a little more each year at a steady rate. The bigger growth in value sits in the commercial base, which includes the data center buildings themselves.

The Ceiling the County Has Already Named

The county's own forecast is the part most buyers haven't seen. The FY 2027 proposed budget, dated February 11, 2026, projects that revenue growth will plateau in the early 2030s. Once all the data center space has been delivered and outfitted, "no material new revenue is anticipated from this source." After that, real property will once again carry a growing share of county revenue. WUSA9 reports that the county's budget guidance says data center revenue "will plateau in the next 5 to 10 years," and that if spending growth isn't under control by then, the Board will need to consider raising tax rates.

The county has put a buffer in place. Supervisors created a Revenue Stabilization Fund in October 2023 with a target of 10 percent of data center revenue. A $39.7 million contribution in FY 2026 brought the fund to $119.7 million. The FY 2027 budget added nothing more. WUSA9 puts this year's target at roughly $130 million, which leaves the fund about $10 million short.

Power supply affects the timeline too. The county says Dominion Energy's transmission expansion allowed it to lift the Eastern Loudoun constraint, imposed in 2022, in late 2025. The county expects strong growth in equipment revenue for 2026 and 2027 as a result. Separately, Loudoun Now reported that Dominion told high-wattage customers their connection waits had grown from one-to-three years to four-to-seven years.

The October Calendar That Sets the Pace

This fall the Board is deciding how much more of that revenue base to approve. The sequence so far:

  1. September 15, 2026. Supervisors voted 7-1-1 to direct staff to draft a resolution pausing final Board action on certain data center and substation applications. The pause would last up to 12 months, measured from a case's Planning Commission public hearing. It would cover legislative applications that need Board approval. Applications would stay active, and developers could keep filing and moving through Planning Commission review.
  2. At that same meeting, Ashburn Supervisor Michael Turner made the motion. He argued for tighter future standards, including a 500-foot residential setback and a 45-decibel noise limit, and he asked for an exception for substations needed for grid reliability.
  3. October 6, 2026. The Board left grandfathering in place. Plans accepted for review by February 12, 2025 keep moving under the old rules, and that protection runs until February 2028.
  4. October 20, 2026. The formal resolution is scheduled for a vote. If it's adopted, it applies retroactively to September 15. The county expects to finish its broader data center policy review in summer 2027.

As of October 7, the October 20 outcome is still pending. Whichever way it goes, existing data centers keep paying and approved projects keep moving. A pause would limit what gets built next. It wouldn't touch current revenue. In earlier coverage, Loudoun Now reported that county staff called lowering the general personal property rate their strongest tool for keeping data center revenue from taking over the budget. At that point, data centers made up 38 percent of General Fund revenue and could pass 60 percent within five to seven years.

Questions Buyers Ask About Ashburn Tax Bills

Does every Ashburn home pay the Metrorail levy?

No. The levy applies only to parcels inside the Metrorail Service Tax District, which is drawn mostly along roads and streams near the stations. The county's parcel lookup confirms the status of an individual parcel.

Would a data center pause raise my rate?

The rate for 2026 is already set. The county's forecast links possible future rate pressure to the revenue plateau expected in the early 2030s, not to a single vote, and a pause would affect new projects, not existing revenue.

Is the Route 28 tax part of a home's bill?

No. The county limits the Route 28 Highway Transportation Improvement District to commercial and industrial property.

Where else do HOA costs and taxes overlap?

They're separate charges. Our guide to what Ashburn HOA fees cover walks through the association side of monthly carrying costs.

When we put together a carrying-cost comparison for an Ashburn home at The Pearl Team, we check the parcel's special district status before we compare it with anything in Fairfax. If you're weighing a specific address near the Silver Line, or you'd like to see how your current assessment stacks up, schedule your free home strategy and we'll go through the tax lines with you.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Work With Us

The Pearl Team are dedicated to helping you find your dream home and assisting with any selling needs you may have. Contact us today to start your home searching journey!

Follow Us on Instagram